Plan a journey
From Porte Maillot to Malakoff Rue Etienne Dolet by subway:
The fastest route in the Paris subway from Porte Maillot to Malakoff Rue Etienne Dolet takes 32 minutes. This route takes lines and . It has only one change at Champs Elysées Clémenceau station . The complete route crosses 18 stations.
Result of the trip Porte Maillot Malakoff Rue Etienne Dolet by subway or RER with a connection:
Nombre de stations |
Ligne de métro et Nom des stations |
|
---|---|---|
Go to Porte Maillot and take subway line towards Château de Vincennes | ||
1 | 1 | Porte Maillot |
2 | 1 | Argentine |
3 | 1 | Charles de Gaulle Etoile |
4 | 1 | Georges V |
5 | 1 | Franklin D. Roosevelt |
6 | 1 | Champs Elysées Clémenceau |
Correspondance Change at Champs Elysées Clémenceau station and take subway line towards Châtillon - Montrouge | ||
7 | 13 | Champs Elysées Clémenceau |
8 | 13 | Invalides |
9 | 13 | Varenne |
10 | 13 | Saint françois Xavier |
11 | 13 | Duroc |
12 | 13 | Montparnasse-Bienvenüe |
13 | 13 | Gaîté |
14 | 13 | Pernety |
15 | 13 | Plaisance |
16 | 13 | Porte de Vanves |
17 | 13 | Malakoff Plateau de Vanves |
18 | 13 | Malakoff Rue Etienne Dolet |
Get off at Malakoff Rue Etienne Dolet | ||
Position of the exits on the platform of the arrival station Malakoff Rue Etienne Dolet (the wagons in green are near the exits) |
The departure point, Porte Maillot, is located at a distance of 7,063 km from the destination (Malakoff Rue Etienne Dolet). On foot, he travel time between the departure and the destination is 1 h 34 mn.
All metro or RER routes to Malakoff Rue Etienne Dolet.
By bike, the trajet Porte Maillot Malakoff Rue Etienne Dolet route takes 33 mn.
Self-service bicycles closest to Porte Maillot
Self-service bicycles closest to Malakoff Rue Etienne Dolet
The inauguration of the Porte Maillot subway station took place on 15 novembre 1936 (19 juillet 1900 pour la première station, déplacée).
The annual attendance of this station is 8 976 380 passengers.
The station Malakoff Rue Etienne Dolet, located at Malakoff, was inaugurated on 9 novembre 1976.
It benefits from an annual attendance of 1 832 499 travellers.
Detailed plan of route Porte Maillot Malakoff Rue Etienne Dolet by subway:
Highly requested routes:
Malakoff Rue Etienne Dolet Gare de Lyon | Malakoff Rue Etienne Dolet Gare du nord | Malakoff Rue Etienne Dolet Gare Montparnasse | Malakoff Rue Etienne Dolet Gare Saint-Lazare
| Malakoff Rue Etienne Dolet Châtelet-les-Halles
| Malakoff Rue Etienne Dolet République
| Malakoff Rue Etienne Dolet Nation
Streets near the departure location Porte Maillot:
Avenue de Malakoff, Boulevard de l’Amiral Bruix, Boulevard Pershing, Boulevard Thierry de Martel, Impasse de Malakoff, Place de la Porte Maillot, Place de Verdun, Rue de Dreux, Rue du Commandant Marchand, Rue Gustave Charpentier, Boulevard Gouvion-Saint-Cyr, Cité Duplan, Place du Général Koenig