Plan a journey
From Pont de Neuilly to Rambuteau by subway:
The fastest route in the Paris subway from Pont de Neuilly to Rambuteau takes 28 minutes. This route takes lines and . It has only one change at Châtelet station . The complete route crosses 16 stations.
RATP Métro 11
11
Métro 11 : Travaux de modernisation - Arrêt non desservi
Jusqu'au 29/05, l'arrêt n'est pas desservi à Porte des Lilas en direction de Mairie des Lilas en raison de travaux de modernisation
RATP Métro 11
11
Métro 11 : Travaux - Trafic interrompu
Le 28/04, trafic interrompu sur l'ensemble de la ligne en raison de travaux.
Bus de remplacement. Plus d'informations sur la page dédiée sur RATP.fr.
Result of the trip Pont de Neuilly Rambuteau by subway or RER with a connection:
Nombre de stations |
Ligne de métro et Nom des stations |
|
---|---|---|
Go to Pont de Neuilly and take subway line towards Château de Vincennes | ||
1 | 1 | Pont de Neuilly |
2 | 1 | Les Sablons |
3 | 1 | Porte Maillot |
4 | 1 | Argentine |
5 | 1 | Charles de Gaulle Etoile |
6 | 1 | Georges V |
7 | 1 | Franklin D. Roosevelt |
8 | 1 | Champs Elysées Clémenceau |
9 | 1 | Concorde |
10 | 1 | Tuileries |
11 | 1 | Palais Royal Musée du Louvre |
12 | 1 | Louvre Rivoli |
13 | 1 | Châtelet |
Correspondance Change at Châtelet station and take subway line towards Mairie des Lilas | ||
14 | 11 | Châtelet |
15 | 11 | Hôtel de Ville |
16 | 11 | Rambuteau |
Get off at Rambuteau | ||
Position of the exits on the platform of the arrival station Rambuteau (the wagons in green are near the exits) |
The departure point, Pont de Neuilly, is located at a distance of 7,362 km from the destination (Rambuteau). On foot, he travel time between the departure and the destination is 1 h 38 mn.
All metro or RER routes to Rambuteau.
By bike, the trajet Pont de Neuilly Rambuteau route takes 34 mn.
Self-service bicycles closest to Pont de Neuilly
Self-service bicycles closest to Rambuteau
The inauguration of the Pont de Neuilly subway station took place on 29 avril 1937.
The annual attendance of this station is 6 786 803 passengers.
The station Rambuteau, located at Paris, was inaugurated on 28 avril 1935.
It benefits from an annual attendance of 4 227 507 travellers.
Detailed plan of route Pont de Neuilly Rambuteau by subway:
Highly requested routes:
Rambuteau Gare de Lyon | Rambuteau Gare du nord | Rambuteau Gare Montparnasse | Rambuteau Gare Saint-Lazare
| Rambuteau Châtelet-les-Halles
| Rambuteau République
| Rambuteau Nation
Streets near the destination Rambuteau:
Cité Noël, Impasse Beaubourg, Impasse Berthaud, Passage des Ménétriers, Passage du Commerce Saint-Martin, Passage du Maure, Rue Beaubourg, Rue Brantôme, Rue du Grenier Saint-Lazare, Rue Geoffroy l’Angevin, Rue Michel le Comte, Rue Rambuteau, Rue aux Ours