Paris subway : from Pont de Neuilly to Arts et Métiers

french version

Plan a journey

Check the metro or RER lines you would like to avoid : - - - - - - - - - - - - - - - - - -

From Pont de Neuilly to Arts et Métiers by subway:

The fastest route in the Paris subway from Pont de Neuilly to Arts et Métiers takes 30 minutes. This route takes lines subway line 1 and subway line 11. It has only one change at Châtelet station . The complete route crosses 17 stations.

2024-04-27 17:14:10
RATP Métro 11
11
Métro 11 : Travaux - Trafic interrompu

Jusqu'au 27/04, trafic interrompu entre Belleville et Mairie des Lilas en raison de travaux.
Bus de remplacement. Plus d'informations sur la page dédiée sur RATP.fr.


Result of the trip Pont de Neuilly Arts et Métiers by subway or RER with a connection:

Détail du trajet Pont de Neuilly Arts et Métiers
Nombre de
stations
Ligne de métro et
Nom des stations
pieton Go to Pont de Neuilly and take subway line subway line 1
towards Château de Vincennes
1 1 Pont de Neuilly
2 1 Les Sablons
3 1 Porte Maillot
4 1 Argentine
5 1 Charles de Gaulle Etoile
6 1 Georges V
7 1 Franklin D. Roosevelt
8 1 Champs Elysées Clémenceau
9 1 Concorde
10 1 Tuileries
11 1 Palais Royal Musée du Louvre
12 1 Louvre Rivoli
13 1 Châtelet
pieton
Correspondance
Change at Châtelet station and take subway line subway line 11
towards Mairie des Lilas
14 11 Châtelet
15 11 Hôtel de Ville
16 11 Rambuteau
17 11 Arts et Métiers
pieton Get off at Arts et Métiers
Position of the exits on the platform of the arrival station Arts et Métiers
(the wagons in green are near the exits)
Position of the exits

The departure point, Pont de Neuilly, is located at a distance of 7,393 km from the destination (Arts et Métiers). On foot, he travel time between the departure and the destination is 1 h 39 mn.

All metro or RER routes to Arts et Métiers.

By bike, the trajet Pont de Neuilly Arts et Métiers route takes 34 mn.

Self-service bicycles closest to Pont de Neuilly

Self-service bicycles closest to Arts et Métiers

The inauguration of the Pont de Neuilly subway station took place on 29 avril 1937. The annual attendance of this station is 6 786 803 passengers.
The station Arts et Métiers, located at Paris, was inaugurated on   19 octobre 1904. It benefits from an annual attendance of 3 908 721 travellers.

Detailed plan of route Pont de Neuilly Arts et Métiers by subway:

 

Highly requested routes:

Arts et Métiers Gare de Lyon | Arts et Métiers Gare du nord | Arts et Métiers Gare Montparnasse | Arts et Métiers Gare Saint-Lazare | Arts et Métiers Châtelet-les-Halles | Arts et Métiers République | Arts et Métiers Nation

Streets near the destination Arts et Métiers:

Place Theodor Herzl, Rue au Maire, Rue Bailly, Rue Beaubourg, Rue Conté, Rue de Turbigo, Rue Montgolfier, Rue Réaumur, Rue Vaucanson, Rue Volta, Cour de Rome, Rue Chapon, Rue des Gravilliers

How to get there by subway ?

Monuments of Paris | Museums of Paris | Performance halls | go to Disneyland Park | go to the Palace of Versailles | Department stores | Grandes écoles de Paris | Research laboratories | Hospitals in Paris and the Paris region | How to take the subway in Paris



      © 2024   www.itineraire-metro.fr   Legal information