Paris subway : from La Courneuve 8 Mai 1945 to Pont de Levallois Bécon

french version

Plan a journey

Check the metro or RER lines you would like to avoid : - - - - - - - - - - - - - - - - - -

From La Courneuve 8 Mai 1945 to Pont de Levallois Bécon by subway:

The fastest route in the Paris subway from La Courneuve 8 Mai 1945 to Pont de Levallois Bécon takes 47 minutes. This route takes lines subway line 7, subway line 2 and subway line 3. It includes two connections at Stalingrad and Villiers. The complete route crosses 25 stations.

Result of the trip La Courneuve 8 Mai 1945 Pont de Levallois Bécon by subway or RER with two connections:

Détail du trajet La Courneuve 8 Mai 1945 Pont de Levallois Bécon
Nombre de
stations
Ligne de métro et
Nom des stations
pieton Go to La Courneuve 8 Mai 1945 and take subway line subway line 7
t Mairie d'Ivry
Villejuif Louis Aragon
1 7 La Courneuve 8 Mai 1945
2 7 Fort d'Aubervilliers
3 7 Aubervilliers-Pantin Quatre Chemins
4 7 Porte de la Villette
5 7 Corentin Cariou
6 7 Crimée
7 7 Riquet
8 7 Stalingrad
pieton
Correspondance
Change at Stalingrad station and take subway line subway line 2
towards Porte Dauphine
9 2 Stalingrad
10 2 La Chapelle
11 2 Barbès Rochechouart
12 2 Anvers
13 2 Pigalle
14 2 Blanche
15 2 Place de Clichy
16 2 Rome
17 2 Villiers
pieton
Correspondance
Change at Villiers station and take subway line subway line 3
towards Pont de Levallois Bécon
18 3 Villiers
19 3 Malesherbes
20 3 Wagram
21 3 Pereire
22 3 Porte de Champerret
23 3 Louise Michel
24 3 Anatole France
25 3 Pont de Levallois Bécon
pieton Get off at Pont de Levallois Bécon
Position of the exits on the platform of the arrival station Pont de Levallois Bécon
(the wagons in green are near the exits)
position des sorties

The departure point, La Courneuve 8 Mai 1945, is located at a distance of 9,884 km from the destination (Pont de Levallois Bécon). On foot, he travel time between the departure and the destination is 2 h 12 mn.

All metro or RER routes to Pont de Levallois Bécon.

By bike, the trajet La Courneuve 8 Mai 1945 Pont de Levallois Bécon route takes 46 mn.

Self-service bicycles closest to La Courneuve 8 Mai 1945

Self-service bicycles closest to Pont de Levallois Bécon

The inauguration of the La Courneuve 8 Mai 1945 subway station took place on 6 mai 1987. The annual attendance of this station is 5 662 148 passengers.
The station Pont de Levallois Bécon, located at Levallois-Perret, was inaugurated on 24 septembre 1937. It benefits from an annual attendance of 4 969 844 travellers.

Detailed plan of route La Courneuve 8 Mai 1945 Pont de Levallois Bécon by subway:

 

Highly requested routes:

Pont de Levallois Bécon Gare de Lyon | Pont de Levallois Bécon Gare du nord | Pont de Levallois Bécon Gare Montparnasse | Pont de Levallois Bécon Gare Saint-Lazare | Pont de Levallois Bécon Châtelet-les-Halles | Pont de Levallois Bécon République | Pont de Levallois Bécon Nation

How to get there by subway ?

Monuments of Paris | Museums of Paris | Performance halls | go to Disneyland Park | go to the Palace of Versailles | Department stores | Grandes écoles de Paris | Research laboratories | Hospitals in Paris and the Paris region | How to take the subway in Paris



      © 2024   www.itineraire-metro.fr   Legal information