Plan a journey
From Châtillon-Montrouge to Le Parc de Saint-Maur by subway:
The fastest route in the Paris subway from Châtillon-Montrouge to Le Parc de Saint-Maur takes 61 minutes. This route takes lines , and . It includes two connections at Montparnasse-Bienvenüe and Châtelet - Les Halles. The complete route crosses 26 stations.
Result of the trip Châtillon-Montrouge Le Parc de Saint-Maur by subway or RER with two connections:
Nombre de stations |
Ligne de métro et Nom des stations |
|
---|---|---|
Go to Châtillon-Montrouge and take subway line t Saint-Denis Université Asnières-Gennevilliers - Les Courtilles | ||
1 | 13 | Châtillon-Montrouge |
2 | 13 | Malakoff Rue Etienne Dolet |
3 | 13 | Malakoff Plateau de Vanves |
4 | 13 | Porte de Vanves |
5 | 13 | Plaisance |
6 | 13 | Pernety |
7 | 13 | Gaîté |
8 | 13 | Montparnasse-Bienvenüe |
Correspondance Change at Montparnasse-Bienvenüe station and take subway line towards Porte de Clignancourt | ||
9 | 4 | Montparnasse-Bienvenüe |
10 | 4 | Saint-Placide |
11 | 4 | Saint-Sulpice |
12 | 4 | Saint Germain des-Prés |
13 | 4 | Odéon |
14 | 4 | Saint-Michel |
15 | 4 | Cité |
16 | 4 | Châtelet |
17 | 4 | Les Halles |
Correspondance Change at Les Halles station and take subway line towards Boissy-Saint-Léger | ||
18 | A | Châtelet - Les Halles |
19 | A | Gare de Lyon |
20 | A | Nation |
21 | A | Vincennes |
22 | A | Fontenay-sous-Bois |
23 | A | Nogent-sur-Marne |
24 | A | Joinville-le-Pont |
25 | A | Saint-Maur-Créteil |
26 | A | Le Parc de Saint-Maur |
Get off at Le Parc de Saint-Maur |
The departure point, Châtillon-Montrouge, is located at a distance of 13,507 km from the destination (Le Parc de Saint-Maur). On foot, he travel time between the departure and the destination is 3 h 00 mn.
All metro or RER routes to Le Parc de Saint-Maur.
By bike, the trajet Châtillon-Montrouge Le Parc de Saint-Maur route takes 1 h 02 mn.
Self-service bicycles closest to Châtillon-Montrouge
Self-service bicycles closest to Le Parc de Saint-Maur
The inauguration of the Châtillon-Montrouge subway station took place on 9 novembre 1976.
The annual attendance of this station is 7 124 158 passengers.
Detailed plan of route Châtillon-Montrouge Le Parc de Saint-Maur by subway:
Highly requested routes:
Le Parc de Saint-Maur Gare de Lyon | Le Parc de Saint-Maur Gare du nord | Le Parc de Saint-Maur Gare Montparnasse | Le Parc de Saint-Maur Gare Saint-Lazare
| Le Parc de Saint-Maur Châtelet-les-Halles
| Le Parc de Saint-Maur République
| Le Parc de Saint-Maur Nation