Paris subway : from Rambuteau to Ledru - Rollin

french version

Plan a journey

Check the metro or RER lines you would like to avoid : - - - - - - - - - - - - - - - - - -

From Rambuteau to Ledru - Rollin by subway:

The fastest route in the Paris subway from Rambuteau to Ledru - Rollin takes 17 minutes. This route takes lines subway line 11 and subway line 8. It has only one change at République station . The complete route crosses 9 stations.

2024-04-27 21:02:21
RATP Métro 11
11
Métro 11 : Travaux - Trafic interrompu

Jusqu'au 27/04, trafic interrompu entre Belleville et Mairie des Lilas en raison de travaux.
Bus de remplacement. Plus d'informations sur la page dédiée sur RATP.fr.


RATP Métro 11
11
Métro 11 : Travaux - Trafic interrompu

Le 28/04, trafic interrompu sur l'ensemble de la ligne en raison de travaux.
Bus de remplacement. Plus d'informations sur la page dédiée sur RATP.fr.


Result of the trip Rambuteau Ledru - Rollin by subway or RER with a connection:

Détail du trajet Rambuteau Ledru - Rollin
Nombre de
stations
Ligne de métro et
Nom des stations
pieton Go to Rambuteau and take subway line subway line 11
towards Mairie des Lilas
1 11 Rambuteau
2 11 Arts et Métiers
3 11 République
pieton
Correspondance
Change at République station and take subway line subway line 8
towards Créteil - Pointe du Lac
4 8 République
5 8 Filles du Calvaire
6 8 Saint-Sébastien Froissart
7 8 Chemin Vert
8 8 Bastille
9 8 Ledru - Rollin
pieton Get off at Ledru - Rollin
Position of the exits on the platform of the arrival station Ledru - Rollin
(the wagons in green are near the exits)
Position of the exits

The departure point, Rambuteau, is located at a distance of 2,002 km from the destination (Ledru - Rollin). On foot, he travel time between the departure and the destination is 27 mn.

All metro or RER routes to Ledru - Rollin.

By bike, the trajet Rambuteau Ledru - Rollin route takes 09 mn.

Self-service bicycles closest to Rambuteau

Self-service bicycles closest to Ledru - Rollin

The inauguration of the Rambuteau subway station took place on 28 avril 1935. The annual attendance of this station is 4 227 507 passengers.
The station Ledru - Rollin, located at Paris, was inaugurated on 5 mai 1931. It benefits from an annual attendance of 3 820 123 travellers.

Detailed plan of route Rambuteau Ledru - Rollin by subway:

 

Highly requested routes:

Ledru - Rollin Gare de Lyon | Ledru - Rollin Gare du nord | Ledru - Rollin Gare Montparnasse | Ledru - Rollin Gare Saint-Lazare | Ledru - Rollin Châtelet-les-Halles | Ledru - Rollin République | Ledru - Rollin Nation

Streets near the destination Ledru - Rollin:

Avenue Ledru-Rollin, Cour de l’Ours, Passage de la Bonne Graine, Rue Antoine Vollon, Rue de Prague, Rue du Faubourg Saint-Antoine, Rue Théophile Roussel, Rue Traversière, Cour de l’Etoile d’Or, Place d’Aligre, Rue Charles Baudelaire, Rue de Charenton, Rue de Charonne

Streets near the departure location Rambuteau:

Cité Noël, Impasse Beaubourg, Impasse Berthaud, Passage des Ménétriers, Passage du Commerce Saint-Martin, Passage du Maure, Rue Beaubourg, Rue Brantôme, Rue du Grenier Saint-Lazare, Rue Geoffroy l’Angevin, Rue Michel le Comte, Rue Rambuteau, Rue aux Ours

How to get there by subway ?

Monuments of Paris | Museums of Paris | Performance halls | go to Disneyland Park | go to the Palace of Versailles | Department stores | Grandes écoles de Paris | Research laboratories | Hospitals in Paris and the Paris region | How to take the subway in Paris



      © 2024   www.itineraire-metro.fr   Legal information